Block 31 Mirabella

Ongoing project includes installation of 15,000 SF soldier pile wall with tiebacks and lagging. Installed 89 piles with tiebacks utilizing CFA drilling techniques to reduce schedule by approximately 3‐weeks. Also included installation of W36x230 cantilever soldier piles to depths of 60’ and permanent welded sheetpile as part of the finished structure. Work performed for Hoffman Construction.